Paste the draft. See which items PJM will flag, with tariff citations and corrections, before you submit.
The trap, in three steps
You submit your interconnection data package. It disappears into the PJM review queue for ten days.
A deficiency letter comes back. You have five days to fix everything before a hard cluster deadline.
Miss the fix window and you lose your position. The LC is already posted.
Submission validator · PJM
Bluefield Solar + BESS
AG2 cycle · hybrid IBR · 180 MW MFO
Readiness
58 / 100
First-pass pass
Unlikely
EMT model (PSCAD) not attached for IBR plant.
PJM Manual 14H §4.3
POI specifies substation but not line/circuit.
PJM Manual 14A §6.3
Aggregate R+jX missing for 100-inverter collector.
PJM Manual 14H §4.3.4
Net MW equals Gross MW without auxiliary subtracted.
OATT Att. N App. 2
Heard from a developer
“I really want the queue management to become a two-way street, instant feedback. One of the things that really bothers me is when you submit your data and your data is deficient in PJM, they will take ten days to review it, and then you’ll take five days. We have AI assistants for everything. I want an AI assistant for this.”
Ruchi Singh, VP Grid Integration, Urban Grid (Brookfield) — Enverus × Pearl Street webinar, 2026-03-02
What you get back
Severity, tariff citation, recommended fix, and an auto-patch for each item PJM will flag. Readiness score out of 100.
Run it yourself
The validator returns every item PJM will flag, with tariff citations and corrections, in about thirty seconds.